Building down into the wet sand required draining the area while working. First, piles were sunk into the ground then pumps removed the water from the surrounding area. When the sand was dry, it was excavated revealing the piles. These were then trimmed and the trap house built on top. All the time, the pumps kept the water at bay. Go to SERVICES to see the design and layout.